Patchogue UFSD


Project Size:
$2.2 Million
Completion Status- Est. Summer 2013
.................................................
Annual Energy Savings: $123,499
Reduction in Energy Costs: 25.3%

.................................................

Project Description
With limited ability to initiate a bond, yet mounting facility needs, Southern Westchester BOCES turned to ECG Engineering and Energy Performance Contracting as a vehicle to improve their buildings without having to come up with out-of-pocket funding. One of the critical needs Southern Westchester BOCES had was a lack of control over the heating of its buildings. The Energy Performance Contract will correct this issue, as well as improve upon lighting, replace a boiler, and many other improvements.

Project Highlights

  • lighting upgrades
  • lighting controls/occupancy sensors
  • weatherization
  • energy management system (EMS) upgrades
  • insulate steam pipes and valves
  • rooftop A/C controllers
  • computer power management
  • boiler replacements
  • air handler refurbishment
  • steam trap repair/replacement
  • boiler controllers
  • destratification fans
  • domestic hot water replacement
  • condensate tank installation