Patchogue UFSD


Project Size:
$16 million
Completion Status- est. October 2011
.................................................
Annual Energy Savings: $858,376
Reduction in Energy Costs: 19%

.................................................

With over 15,000 students attending annually, Sachem is the largest suburban school district in New York State.

When the district was considering a costly commissioning project in 2007, administrators turned to ECG to help them accomplish their commissioning needs, as well as make other energy saving upgrades to their facilities, through Energy Performance Contracting.

The result was a project that will bring over $16 million worth of energy-related capital improvements to the district with zero taxpayer impact.

Sachem is also on schedule to become the first district on Long Island to generate wind energy through this project.

Project Highlights

  • 10 kw wind turbine
  • 5 kw photovoltaic systems at 6 buildings
  • exterior insulation and new siding at Gatelot School
  • lighting system upgrades; occupancy sensors
  • upgrade to the existing Energy Management Control
  • boiler controllers and boiler replacements
  • door weather-stripping, sealing of rooftop units and roof/wall joints
  • steam trap repair/replacement
  • insulation of steam piping and valves
  • variable speed drives on fans and pumps
  • wireless clock systems
  • waste oil heater; programmable timers on block heaters
  • high efficiency transformers