ecg logoecg taglineecg top
 
Patchogue UFSD


Project Size:
$3.3 Million
Completion Status- Est. Summer 2013
.................................................
Annual Energy Savings: $205,530
Reduction in Energy Costs: 25.6%

.................................................

Project Description
As a response to mounting financial challenges, Administrators at the Rockville Centre School District initiated an Energy Performance Contract to accomplish capital needs without taxpayer impact, save energy, and lower future operating costs. The Energy Performance Contract  that was developed includes a host of energy savings measures that will greatly improve the performance of the District’s building systems, as well as improve the lighting and thermal comfort of each classroom.

Project Highlights

  • lighting upgrades and controls
  • occupancy sensors
  • exterior lighting improvements
  • energy management system
  • weatherization
  • insulate steam pipe/valves
  • premium efficiency motors
  • steam trap repair/replacement
  • boiler controllers
  • kitchen hood controls
  • kitchen pre-wash valves
  • computer power management
  • photovoltaic (solar) panels
  • boiler replacements
  • variable frequency drives

Back to Portfolio Page